HOG Project piling works at Chennai
Back to Projects

HOG Project

Chennai

720 nos. of 600mm dia piles at 20m depth — currently in execution in Chennai.

Project Overview

An ongoing Chennai package of 720 bored cast in-situ piles at 600mm diameter, founded at 20 metres.

Multiple rigs, winches and slurry pumps are mobilised on site with a dedicated site office, genset and starter board so that boring and concreting can run in parallel across grid zones.

Progress is monitored daily by our project engineers with a regular reporting system back to the proprietor.

Scope of Work

  • Setting out and verification of pile positions against the structural grid at Chennai, jointly signed off with the client's site engineer.
  • Boring / driving of 720 piles at 600 mm diameter to a founding depth of 20 m using the bored cast in-situ pile (dmc method).
  • Fabrication, lowering and centring of reinforcement cages with cover blocks to the specified concrete cover.
  • Continuous tremie concreting of every pile with cube sampling and pour records maintained per pile.
  • Chipping back to cut-off level, disposal of muck and handover of the as-built pile schedule.

Machinery & Plant Deployed

  • Tractor mounted rotary DMC rigs with mud pumps and circulation tanks
  • Bentonite mixing and desanding plant with specific gravity check kit
  • Weighted chisels for penetrating hard laterite and boulder strata
  • Reinforcement cage fabrication yard with bar bending and cutting machines
  • Tremie pipe assembly with hopper for continuous concrete placement
  • Transit mixers with on-site slump and cube testing

Execution Timeline

  1. Mobilisation

    Rigs, cages, casings and site establishment moved to Chennai, with access roads and working platform levelled for rig movement.

  2. Trial pile & test bore

    A trial pile was executed and observed against the borelog to confirm strata, penetration rate and concrete consumption before the production schedule opened.

  3. Production piling

    720 piles executed in a planned sequence to keep rigs clear of freshly cast piles, holding the In progress programme.

  4. Testing & handover

    Load and integrity testing on the agreed sample of piles, followed by trimming to cut-off level and handover of records to the main contractor.

Load Testing & Quality Results

Initial load testTest pile loaded in increments to 2.5 times the design working load as per IS 2911 Part 4, with each increment held until the settlement rate stabilised. Safe working load confirmed for the 600 mm pile section.
Routine load testWorking piles from the production schedule tested to 1.5 times design load. Settlement at test load and residual settlement after unloading remained within the permissible limits laid down in the code.
Pile integrity testLow-strain integrity testing carried out on sample piles; reflectograms showed continuous shafts with no necking or discontinuity down to the founding level.
Concrete cube testingCubes cast from every pour and tested at 7 and 28 days, with all results meeting or exceeding the specified grade.

Site Gallery

Bored Cast In-Situ Pile (DMC Method) in progress at HOG Project, Chennai
Bored Cast In-Situ Pile (DMC Method) in progress on site at Chennai.
Reinforcement cage lowering for piles at Chennai
Reinforcement cage lowered and centred before tremie concreting.
Completed pile heads awaiting trimming at Chennai
Completed pile heads awaiting trimming back to cut-off level.

Technical terms used above are explained in our piling glossary.

Scope Highlights

  • Multi-rig deployment for parallel boring and concreting
  • Full site establishment — site office, genset, starter board, workshop backup
  • Daily progress reporting and supervision by project engineers

Project Details

Client
HOG Project
Location
Chennai
Status
Running
Technique
Bored Cast In-Situ Pile (DMC Method)
No. of Piles
720 piles
Pile Diameter
600 mm
Depth
20 m
Duration
In progress
Enquire About Similar Work
Call WhatsApp Enquire